A heavily reduced service is in operation Newport (South Wales) and Cardiff Central. Latest information can be found in <a href="https://www.nationalrail.co.uk/service-disruptions/newport-20260801/">Status and Disruptions.</a>
Trains running between Barry and Barry Island / Bridgend may be cancelled or revised. Latest information can be found in <a href="https://www.nationalrail.co.uk/service-disruptions/barry-20260803/">Status and Disruptions</a>.
09:54
Expected10:15
London Paddington
Calling at:
Cardiff Central (10:34)
Newport (South Wales) (10:46)
Bristol Parkway (11:06)
Swindon (11:29)
Reading (11:53)
London Paddington (12:15)
This service has been delayed by a fault with the signalling system