Swansea
- Bridgend (10:58)
- Port Talbot Parkway (11:10)
- Neath (11:18)
- Swansea (11:30)
This service has been delayed by a fault with the signalling system
Departures
A heavily reduced service is in operation Newport (South Wales) and Cardiff Central. Latest information can be found in <a href="https://www.nationalrail.co.uk/service-disruptions/newport-20260801/">Status and Disruptions.</a>
Trains running between Barry and Barry Island / Bridgend may be cancelled or revised. Latest information can be found in <a href="https://www.nationalrail.co.uk/service-disruptions/barry-20260803/">Status and Disruptions</a>.
Great Western Railway services between London Paddington and Didcot Parkway / Oxford may be cancelled or revised. Latest information can be found in <a href="https://www.nationalrail.co.uk/service-disruptions/gw-weather-20260803/">Status and Disruptions</a>.
This service has been delayed by a fault with the signalling system
This service has been delayed by a road vehicle colliding with level crossing barriers earlier today
This service has been delayed by a fault with the signalling system
This service has been delayed by a road vehicle colliding with level crossing barriers earlier today
via Rhoose Cardiff Int Airport

This train has already left the station.