Swansea
- Bridgend (13:40)
- Port Talbot Parkway (13:52)
- Neath (13:59)
- Swansea (14:10)
This service has been delayed by a fault with the signalling system
Departures
A heavily reduced service is in operation Newport (South Wales) and Cardiff Central. Latest information can be found in <a href="https://www.nationalrail.co.uk/service-disruptions/newport-20260801/">Status and Disruptions.</a>
Trains running between Barry and Barry Island / Bridgend may be cancelled or revised. Latest information can be found in <a href="https://www.nationalrail.co.uk/service-disruptions/barry-20260803/">Status and Disruptions</a>.
Great Western Railway services between London Paddington and Didcot Parkway / Oxford may be cancelled or revised. Latest information can be found in <a href="https://www.nationalrail.co.uk/service-disruptions/gw-weather-20260803/">Status and Disruptions</a>.
This service has been delayed by a fault with the signalling system
This service has been delayed by a late running train being in front of this one
This service has been delayed by a fault with the signalling system earlier today

This train has already left the station.