09:50
Expected 10:12
Brighton
Calling at:
- Haywards Heath (10:21)
- Burgess Hill (10:26)
- Brighton (10:38)
12 coaches
This service has been delayed by earlier engineering works not being finished on time
Departures
This service has been delayed by earlier engineering works not being finished on time
This service has been delayed by a fault with the signalling system
This service has been delayed by a fire next to the track
This service has been delayed by a speed restriction
via Horsham
via London Bridge
via London Bridge
via Gatwick Airport
This service has been delayed by a fault with the signalling system
via Horsham
via London Bridge
via London Bridge
via Gatwick Airport
This service has been delayed by failure of the electricity supply earlier today

This train has already left the station.