12:50
Expected 12:53
Brighton
Calling at:
- Haywards Heath (12:59)
- Burgess Hill (13:05)
- Brighton (13:18)
12 coaches
This service has been delayed by engineering works not being finished on time
Departures
This service has been delayed by engineering works not being finished on time
via London Bridge
via London Bridge
via Gatwick Airport
via Horsham
via London Bridge
via London Bridge
via Gatwick Airport
via Horsham
via London Bridge
via London Bridge
via Gatwick Airport

This train has already left the station.