London North Eastern Railway punctuality & performance
- PPM (on time at destination)
- 81.1%
- Rank
- 17 of 24
- Cancellation score
- 6.8%
- Sector
- Long Distance
- vs GB average
- −6.0 pp
Overview
London North Eastern Railway is a long distance operator in Great Britain. For January to March 2026, the operator recorded a PPM of 81.1%, placing it 17 of 24 operators in the ORR data — 6.0 percentage points below the network average of 87.1%. Cancellation score for the period was 6.8%.
PPM measures whether London North Eastern Railway trains complete their booked journeys on time at the final destination. The metric is widely used in industry reporting and is comparable across operators within the same sector classification, though long-distance services are measured against a ten-minute window rather than five.
Passengers on London North Eastern Railway services can use StationView live departure boards to check today's trains at major stations. Official ORR statistics summarise historical performance; live boards show current delays, cancellations, and platform information for individual services.
Data period: January to March 2026. Source: Office of Rail and Road passenger rail performance statistics.
Nearby rankings
| Rank | Operator | PPM |
|---|---|---|
| 17 | London North Eastern Railway | 81.1% |
| 15 | Govia Thameslink Railway | 82.6% |
| 16 | Transport for Wales Rail | 82.5% |
| 18 | East Midlands Railway | 80.3% |
| 19 | Northern | 79.8% |
Live departures at major stations
Frequently asked questions
What is London North Eastern Railway's punctuality?
For January to March 2026, London North Eastern Railway recorded a PPM of 81.1%, ranking 17 of 24 UK operators in the ORR data.
Is London North Eastern Railway reliable?
London North Eastern Railway operates in the Long Distance sector. Its PPM of 81.1% compares to a Great Britain average of 87.1% for the same period. Reliability depends on your route and time of travel — check live departures for today's services.
Where does this data come from?
Statistics are from the Office of Rail and Road (ORR) passenger rail performance release for January to March 2026. StationView presents the official figures in a readable format and links to live departure boards.